Control · Cost and Revenue Control

The forecast is updated upon release, not on the reporting date.

PROBIS Control bridges the gap between events and analysis: approvals, addenda, and construction progress are immediately incorporated into cost reports, forecasts, cash flow, and liquidity. The monthly report is thus simply a reflection of what you already know.

Get More Out of Your Existing ERP System

PROBIS connects directly to SAP, MS Dynamics, Oracle, and Yardi and provides the key metrics you need without disrupting your workflows.

Denver Tower II — Cost Report · Live · PROBIS Control
Cost Report
Invoices
Detailed report
Cash flow
Liquidity
Budget
$203.1M
Committed
$156.5M
Invoiced
$108.6M
Forecast
$206.1M
Variance
−$3.0M

Denver Tower II

Denver, CO · Mixed-Use

Budget Expenditures
as of Aug. 21, 2026 · gross
Invoiced $108.6 million
Committed, not yet invoiced: $47.9 million
Unallocated $46.6M
Cost group
Budget
Committed
Invoiced
Forecast
Variance
03–09 Shell & Core
121,000,000
96,000,000
67,000,000
123,100,000
−2,100,000
21–28 MEPs
46,000,000
38,200,000
24,600,000
47,300,000
−1,300,000
31–33 Site Work
9,500,000
4,500,000
2,200,000
9,300,000
+200,000
01 Soft Costs
26,600,000
17,800,000
14,800,000
26,400,000
+200,000
Total
203,100,000
156,500,000
108,600,000
206,100,000
−3,000,000
●
Synced with ERP · 2 minutes ago
Export PDF
Control · Cost and Revenue Control

The forecast is updated upon release,not on the reporting date.

PROBIS Control bridges the gap between events and analysis: approvals, addenda, and construction progress are immediately incorporated into cost reports, forecasts, cash flow, and liquidity. The monthly report is thus simply a reflection of what you already know.

Get More Out of Your Existing ERP System

PROBIS connects directly to SAP, MS Dynamics, Oracle, and Yardi and provides the key metrics you need without disrupting your workflows.

Frankfurt Tower II — Cost Report · Live · PROBIS Control
Cost Report
Invoices
Detail Report
Cash flow
Liquidity
Budget
€186.8 million
Commissioned
€143.9 million
Billed
99.8 million euros
Forecast
€189.7 million
Deviation
−2.9 million euros

Frankfurt Tower II

Frankfurt · Mixed-use

Budget Utilization
As of August 21, 2026 · gross
Invoiced: 99.8 million euros
Committed, not yet settled: €44.1 million
Not yet allocated: €42.9 million
Cost Group
Budget
Commissioned
Billed
Forecast
Deviation
300 Structures – Building Constructions
111.300.000
88.300.000
61.600.000
113.300.000
−2.000.000
400 Structures – Technical Systems
42.300.000
35.100.000
22.600.000
43.500.000
−1.200.000
500 outdoor facilities
8.700.000
4.100.000
2.000.000
8.600.000
+100.000
700 Construction-Related Expenses
24.500.000
16.400.000
13.600.000
24.300.000
+200.000
Total
186.800.000
143.900.000
99.800.000
189.700.000
−2.900.000
●
Synced with ERP · 2 min ago
Export as PDF
Scope of Services Offered by Control
Four Perspectives · One Dataset
OverviewCost Report · Invoices · Forecast+
​

The current cost situation: budget, work orders, invoices, and cost forecasts—all on a single interface, recalculated with every approval. The invoice workflow, detailed reports, and forecast calculations all access the same data set.

View the cost report and billing workflow →
CAPEX/OPEXTen-Year and Rolling Budgets+
​

Same methodology, longer time horizon. Plan investment and operating budgets at the property, sub-area, or project level, using ten-year or rolling models. Projects are recorded, prioritized, approved, and released via a workflow.

View the 10-Year Action Matrix →
Cash flowPayments Based on Contract Terms+
​

The payment schedules are derived from your contracts: retention amounts, installment agreements, payment deadlines, and approved amendments automatically shape the payment curve, which is then adjusted based on incoming invoices. Analysis at the project, phase, or portfolio level.

View the comparison of planned vs. actual payments →
LiquidityDrawdowns · Coverage · Shortfall+
​

Equity and debt capital calls are modeled against projected disbursements. The funding coverage is updated, and any shortfall is automatically flagged. The “equity first,” pro rata, or individual call sequences are in accordance with the loan agreement.

View FinancingCoverage→

how it works

Incoming Invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Gross amount
184.200,00 €
Service Period
09/2026
✓ Data detected
→ Assigned to a contract
01

Entrance

An invoice or document is received; PROBIS reads the data and assigns it to the contract.

Approval Workflow
Level 2 / 3
RE-2026-0418
184.200,00 €
PL
Project Management
Fact-checked
✓ Done
BL
Construction Management
Verify mathematically
Under review
CEO
Management
Final Approval
Wait
02

Assignment

The approval workflow forwards the document in the specified order.

Exam RE-2026-0418
3 items
Position
Amount · Status
01 Earthwork
120.000 €
Approved
02 Reinforced Concrete
52.40048.900 €
Corrected
03 Addendum 07
11.800 €
Rejected
Approved for Payment
168.900 €
03

Approval

Payments are approved, corrected, or rejected. Status: approved, then paid.

Costs
↻ Live
KG
Budget
Forecast
200 Preparatory Measures
150.0 million
153.6 million
300 Building Construction
150.0 million
207.6 million
400 Technical Facilities
120.0 million
158.4 million
▲ +168,900 € from RE-2026-0418
✓ Forecast
✓ Cash Flow
✓ Liquidity
04

Recalculation

The budget, cost forecast, cash flow, and liquidity are all updated in a single step.

Report · Cash-Out Plan
PDF
Cut-off dateToday20242025202620272028
Plan
Is
Outflow / Month
05

Analysis

Any view on demand—without manual compilation.

how it works

Incoming Invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Gross amount
184.200,00 $
Service Period
09/2026
✓ Data detected
→ Assigned to a contract
01

Entrance

An invoice or document is received; PROBIS reads the data and assigns it to the contract.

Approval Workflow
Level 2 / 3
RE-2026-0418
184.200,00 $
PL
Project Management
Fact-checked
✓ Done
BL
Construction Management
Verify mathematically
Under review
CEO
Management
Final Approval
Wait
02

Assignment

The approval workflow forwards the document in the specified order.

Exam RE-2026-0418
3 items
Position
Amount · Status
01 Earthwork
120.000 $
Approved
02 Reinforced Concrete
52.40048.900 $
Corrected
03 Addendum 07
11.800 $
Rejected
Approved for Payment
168.900 $
03

Approval

Payments are approved, corrected, or rejected. Status: approved, then paid.

Costs
↻ Live
KG
Budget
Forecast
200 Preparatory Measures
150,0 M.
153,6 M.
300 Building Construction
150,0 M.
207,6 M.
400 Technical Facilities
120,0 M.
158,4 M.
▲ +168,900 € from RE-2026-0418
✓ Forecast
✓ Cash Flow
✓ Liquidity
04

Recalculation

The budget, cost forecast, cash flow, and liquidity are all updated in a single step.

Report · Cash-Out Plan
PDF
Cut-off dateToday20242025202620272028
Plan
Is
Outflow / Month
05

Analysis

Any view on demand—without manual compilation.

One data model, different perspectives

Three weeks flying blind. Every month.

Today

  • —The cost report is compiled manually each month using conflicting sources. Decisions are made based on yesterday’s figures.
  • —Invoices are piling up in mailboxes and on desks. No one knows what’s been waiting there or for how long. Cash discounts and payment deadlines are expiring.
  • —The cash flow forecast is a separate table and lags behind. Funding gaps only become apparent when funds are drawn down.
  • —The discrepancy becomes apparent three weeks after the decision. By then, the contract has already been awarded.

With PROBIS

  • The cost report is live: Set your filters, and you're done. The same number for everyone involved.
  • Every invoice has a status, an assigned person, and a processing time. Bottlenecks become apparent before deadlines are missed.
  • Calculate costs, cash flow, and liquidity based on the same contracts. You'll see shortfalls months before they occur.
  • The variance appears along with its origin and the cause. You can still re-post the job, reschedule, or assign it differently.

Invoice approvals with immediate impact on the budget and forecasts

  • Invoice automatically recognized and assigned to a contract and cost group
  • Multi-level approval process with roles, teams, and triggers; budget and forecast impact visible before every decision
  • Batch runs for routine calculations; verification time is factored into the exceptions
  • Invoice approval record with complete audit history, verifiable for banking, auditing, and controlling purposes
  • Status up to "Paid," time in system per user, cash flow, and liquidity are updated with each approval
Invoice Approval — INV-2026-0418 · Brandner Electric LLC
invoice_0418.pdf
Recognized fields
OCR · 98% confidence
Supplier
Brandner Electric LLC
Invoice number
INV-2026-0418
Large
$454,080.00
Retainage: 10%
−$45,408.00
Contract match
C-0117 · Electrical · section 26 05 00 — matched
Step 1 · Technical
Approved
M. Keller · Aug. 19
Step 2 · Commercial
Pending for 4 days
A. Sanders · Aug. 23
Step 3 · Release
Not started
Finance Team
Budget Impact
26 05 00 · 71% used
Cover Sheet
Stamped
Batch run
18 routine invoices

A cost structure that allows for any kind of analysis

  • Detailed Report on Contracts, Titles, Taxonomy, and Cost Structure
  • Net and Gross Views of the Same Data Set
  • Widget reports in the dashboard layout with the auditability of a report
  • Export to PNG, PDF, Excel, or Power BI
  • Variance Analysis Against Budget, Forecast, and Any Previous Figure
Detailed Report — Cost Transactions · Data Cube
CSI Division
21–28
Cost center
DEN-02
Location
Tower B
Engineer of Record
Meridian MEP
Period
Q3 2026
1,284 transactions · 42 contracts
Large
Net of retainage
Transaction
Contract
Section
Date
Large
INV-2026-0418 · Brandner
C-0117
26 05 00
08/19/26
454,080
INV-2026-0402 · Northline
C-0104
23 05 00
08/14/26
315,095
CO-11 · Riser Relocation
C-0104
23 05 00
08/11/26
71,390
INV-2026-0388 · White
C-0122
22 10 00
08/07/26
144,342
INV-2026-0371 · Summit
C-0130
14 20 00
08/02/26
240,900
Total selection
—
—
—
1,225,807
Export · PNG / PDF / XLSX / Power BI
Variance vs. forecast v7: −0.6%

Forecasts that stand up to any scrutiny.

The forecast is generated using the same processes as your cost report. This way, you can explain each figure instead of having to recalculate it.

  • Forecast by cost element, order, cost group, and for the entire project, based on work orders, invoices, risk assessments, and pending awards
  • Each forecast version is retained. Changes compared to the previous version, the previous month, and the reference date can be traced, including the reason for each change.
  • Costs Through Completion at a Glance: Budget, Paid, Contracted, Not Yet Awarded
  • Milestone Trend Analysis: Cost and Schedule Trends at a Glance
Cost to Complete — Bridging the Gap Between Budget and Forecast
Budget → forecast ($M, gross)
Forecast v8 · Aug. 21, 2026
203.1
108.6
47.9
46.6
−3.0
Budget
Paid
Committed, not billed
Unawarded
Forecast variance
Cost to Complete
$97.5M
Estimated completion date
$206.1M
Drift vs. v7
+$1.0M

Invoice approvals with immediate impact on the budget and forecasts

  • Invoice automatically recognized and assigned to a contract and cost group
  • Multi-level approval process with roles, teams, and triggers; budget and forecast impact visible before every decision
  • Batch runs for routine calculations; verification time is factored into the exceptions
  • Invoice approval record with complete audit history, verifiable for banking, auditing, and controlling purposes
  • Status up to "Paid," time in system per user, cash flow, and liquidity are updated with each approval
Invoice Approval — RE-2026-0418 · Brandner Elektrotechnik GmbH
invoice_0418.pdf
Recognized Fields
OCR · 98% accuracy
Supplier
Brandner Elektrotechnik, LLC
Invoice Number
RE-2026-0418
Gross
417.600,00 €
10% retention for security purposes
−41.760,00 €
Contract Assignment
V-0117 · Electrical · KG 440 High-Voltage Systems — assigned
Step 1 · Technical Inspection
Approved
M. Keller · Aug. 19
Step 2 · Business Review
Open for 4 days
A. Schneider · Due August 23
Step 3 · Approval
Not started
Accounting
Impact on the budget
KG 440 · 71% used
Cover Page
Stamped
Relay Race
18 Routine Calculations

A cost structure that allows for any kind of analysis

  • Detailed Report on Contracts, Titles, Taxonomy, and Cost Structure
  • Net and Gross Views of the Same Data Set
  • Widget reports in the dashboard layout with the auditability of a report
  • Export to PNG, PDF, Excel, or Power BI
  • Variance Analysis Against Budget, Forecast, and Any Previous Figure
Detailed Report — Cost Transactions · Data Cube
Cost Group
400
Cost Center
FRA-02
Construction Phase
Tower B
Specialist Planner
Meridian TGA
Time period
Q3 2026
1,284 transactions · 42 contracts
Gross
Less withholding
Process
Contract
Cost Group
Date
Gross in €
RE-2026-0418 · Brandner
V-0117
440
19.08.26
417.600
RE-2026-0402 · Nordluft
V-0104
430
14.08.26
289.890
NT-11 · Riser Installation
V-0104
430
11.08.26
65.680
RE-2026-0388 · White
V-0122
410
07.08.26
132.795
RE-2026-0371 · Steiner
V-0130
460
02.08.26
221.630
Total Selection
—
—
—
1.127.595
Export · PNG / PDF / XLSX / Power BI
Deviation from Forecast v7: −0.6%

Forecasts that stand up to any scrutiny.

The forecast is generated using the same processes as your cost report. This way, you can explain each figure instead of having to recalculate it.

  • Forecast by cost element, order, cost group, and for the entire project, based on work orders, invoices, risk assessments, and pending awards
  • Each forecast version is retained. Changes compared to the previous version, the previous month, and the reference date can be traced, including the reason for each change.
  • Costs Through Completion at a Glance: Budget, Paid, Contracted, Not Yet Awarded
  • Milestone Trend Analysis: Cost and Schedule Trends at a Glance
Costs Through Completion — From Budget to Forecast
Budget → Forecast (in millions of euros, gross)
Forecast v8 · August 21, 2026
186,8
99,8
44,1
42,9
−2,9
Budget
Paid
Ordered, but not billed
Not yet assigned
Forecast Variance
Costs Through Completion
€89.7 million
Total Cost Forecast
€189.7 million
Changes from v7
+0.9 million euros
Forecast
Cash Flow · Liquidity · CAPEX/OPEX

Three views, one cost reality.

Cash flow, liquidity, and the ten-year plan can otherwise quietly diverge across three separate spreadsheets. In PROBIS, all three are based on the same contracts and approvals.


Multi-year investment and operating budgets, all on the same platform

  • Multi-year and rolling budgets with annual reconciliation
  • Track the capture, prioritization, and approval workflow, including deadlines and escalation
  • Capital allocation analysis based on ROI, urgency, or value retention potential
  • Seasonal and cyclical patterns in spending throughout the fiscal year
  • CAPEX/OPEX figures that directly influence cash flow and financial planning
  • Alignment with ESG, maintenance, and asset strategy goals
Ten-Year Plan — Measures by Year ($k)Northeast Portfolio · Spending Intensity
Measure26272829303132333435Status
Roof & Envelope1327041,07823144​99418​66Approved
HVAC Equipment Replacement612641,29883617677​286572​In workflow
Elevator Modernization​418495132​924374​66198Prioritized
Energy Retrofit · ESG3191,01275946225311655​​​Approved
Facade Cleaning · OPEX94949999116105110110105105Released
Parking garage structure​​1986711,166330​​215407Captured
Cell shading = shading intensity10-year total: $15.9 million · rolling

Cash flow derived from the contracts, not entered into a model

  • Automated outflow planning based on contract payment terms and the execution timeline
  • Outstanding payables allocated to periods based on rules you configure
  • Actuals and plan are plotted on the same curve, so the drift is visible rather than calculated
  • Roll up cash flow across projects, entities, or the entire portfolio
Cumulative Outflow — Plan vs. Actual ($M)Horizon: 36 months
$8.1 million ahead of schedule
MONTH 23
M1M12M23 · todayM36

Know when you're running low so you have enough time to do something about it

  • Equity and debt draws modeled based on the actual outflow forecast
  • Funding coverage and headroom projected forward over the project timeline
  • Peak demand and shortfall date identified automatically
  • Draw request packages generated from the same data that the lender monitors
Funding coverage — draws vs. outflows ($M)Equity-first · facility: $140.8M
Cover Breached · Month 26
SHORTFALL $4.5M
M1M12M26M36
EquityDebt DrawsForecast outflowHeadroom line
Forecast
Cash Flow · Liquidity · CAPEX/OPEX

Three Perspectives on Cost Transparency.

Cash flow, liquidity, and the ten-year plan would otherwise diverge unnoticed across three separate spreadsheets. In PROBIS, all three are derived from the same contracts and approvals.


Multi-year investment and operating budgets using the same classification system

  • Multi-year and rolling budgets with annual reconciliation
  • Action Tracking, Prioritization, and Approval Workflow with Deadlines and Escalation
  • Allocation of Funds Based on Return, Urgency, or Potential for Preserving Value
  • Seasonal and Cyclical Distribution of Expenditures Over the Fiscal Year
  • CAPEX and OPEX figures are directly incorporated into cash flow and financial planning
  • Alignment with ESG, maintenance, and property strategy goals
Ten-Year Plan Measures by Year (in thousands of euros)Northern Portfolio · Expenditure Intensity
Action26272829303132333435Status
Roof & Facade1327041,07823144​99418​66Approved
Renovation of Building Services612641,29883617677​286572​In the workflow
Elevator Modernization​418495132​924374​66198Prioritized
Energy-Efficient Renovation · ESG3191,01275946225311655​​​Approved
Facade Cleaning · OPEX94949999116105110110105105Approved
Parking Garage Structural System​​1986711,166330​​215407Recorded
Color intensity = expenditure level Ten-year total: €14.5 million · rolling

Cash flow from the contracts, not from a model

  • Automated Payment Scheduling Based on Contract Terms and the Construction Schedule
  • Open items are allocated to periods according to your rules
  • Actual and planned values on a graph—deviations are visible but cannot be calculated
  • Aggregation by project, company, or the entire portfolio
Cumulative Payouts — Budget/Actual (€ million)36-Month Horizon
Is €7.4 million over budget
MONTH 23
M1M12M23 · todayM36

Know the date of the shortfall early enough to take action

  • Equity and debt capital calls modeled against the cash flow forecast
  • Funding Coverage and Flexibility Throughout the Entire Project Duration
  • Peak demand and the timing of shortfalls are determined automatically
  • Draw requests generated from the same data that the bank reviews
Funding Coverage — Drawdowns/Disbursements (in millions of €)Equity first · Line: €128 million
Shortfall · Month 26
SHORTFALL OF €4.1 MILLION
M1M12M26M36
EquityDrawdowns on debtProjected PayoutsCoverage ratio l
In Out
PROBIS control Live
Contracts and Commitments from the Contract
Invoices via upload, email, or ERP
Progress and schedule data
Payment Terms and Loan Agreements
Cost reports and variance reports
Cash Flow and Liquidity Forecasts
Draw Requests
ERP postings and Power BI feeds
contracts invoices progress payment terms contracts →cost report invoices →cash flow progress →draw request payment terms →ERP feed
In Out
PROBIS control Live
Contracts and Commitments from the Contract
Invoices via upload, email, or ERP
Progress and schedule data
Payment Terms and Loan Agreements
Cost reports and variance reports
Cash Flow and Liquidity Forecasts
Draw Requests
ERP postings and Power BI feeds
contracts invoices progress payment terms contracts →cost report invoices →cash flow progress →draw request payment terms →ERP feed

Also in Control

Overview of Tasks

Every user can see what's coming up—including the lead time.

Automatic Triggers

Workflows that start automatically when a specific event occurs.

Document Workflow

Upload, recognize, generate, archive.

Budget Update

Controlled, versioned, with justification codes.

Accruals and Period-End Closing

For monthly and annual financial statements.

Invoice Import

Bulk import using a CSV or XLSX template.

Cross-Project Analysis

The same report covering several projects.

Custom Fields for Each Object

Identify what your process requires.

Entitlements by Cost Group

External participants can only see their own section.

Case Studies · Control

Four projects whose costs are tracked in real time in PROBIS Control.

From a data center to a hospital to a high-rise in Berlin. Select a project to learn more.

Hanau Data Center
01 / 04
Hanau Data Center
Hanau, Germany
Case Study · Data Center

A $172 million data center, completed within 2% of budget.

Google's data center in Hanau was developed by the NDC-GARBE joint venture, approximately 12 to 16 miles from the DE-CIX internet exchange in Frankfurt. The four-story facility covers approximately 107,600 square feet and handles approximately 15 MW of IT load, with a capital expenditure of approximately USD 172 million. PROBIS was involved from the pre-construction phase, managing quantity surveying, pro forma analysis, and cost control from the outset, ensuring that commitments and expenditures were tracked against the approved budget throughout the project. The project was completed on schedule and came in within approximately two percent of its approved budget.

Read the full project profile →
Capex$172M
IT load15 MW
Final Cost vs. Budgetwithin approximately 2%
Developer
NDC-GARBE
Size
approx. 107,600 sq ft
Location
Hanau, Germany
Modules
Control
Braunschweig Municipal Hospital
02 / 04
Braunschweig Hospital
Braunschweig, Germany
Case Study · Healthcare

A 1,499-bed hospital, expanded based on a single cost structure.

The expansion and renovation of Braunschweig Municipal Hospital combines new construction with the existing building around a new entrance building. The hospital treats more than 61,000 inpatients a year. Turner & Townsend manages the project’s cost and commercial management in PROBIS Control. Extensive process and interface technology, including a connection to thinkproject, keeps documents and costs in a single, real-time view.

Read the full project profile →
Beds1,499
Project areaapprox. 933,000 sq ft
Clinics21
Cost Management
Turner & Townsend
Size
approx. 933,000 sq ft
Integration
thinkproject
Modules
Control
East Side Tower, Berlin
03 / 04
East Side Tower
Berlin, Germany
Case Study · Lender Monitoring

Five banks, up to 1,200 files, one source of truth.

East Side Tower is a 466-foot, 38-story high-rise in Berlin-Friedrichshain designed by BIG to house Amazon’s European headquarters. Construction monitoring is managed through PROBIS for a consortium consisting of Deutsche Pfandbriefbank, Commerzbank, Helaba, Berlin Hyp, and Berliner Sparkasse. A project of this scale can involve 20 to 100 parties and generate up to 1,200 files. Project-Clock provides the banks with centralized fund tracking, real-time risk detection, and AI-generated reports, replacing disconnected spreadsheets.

Read the full project profile →
Tower height466 ft
Bank consortium5
Gross floor areaapprox. 866,500 sq ft
Financing
5-bank consortium
Architect
BIG
Stories
38
Modules
Control · Project Clock
ANNI, Munich
04 / 04
ANNI
Munich, Germany
Case Study · Office Redevelopment

$150 million, reported monthly to MaRisk and BCBS 239.

ANNI is a large office complex on St.-Martin-Straße in Munich. It was originally built as part of a Siemens campus and designed by the “School of Richard Meier.” The project involves modernization, structural additions, and the renovation of outdoor areas, financed by a consortium led by Deutsche Pfandbriefbank. PROBIS provides construction monitoring throughout the project. It produces monthly reports on cost, schedule, quality, and project organization that comply with MaRisk and BCBS 239 requirements.

Read the full project profile →
Investment volumeapprox. $150M
Total areaapprox. 355,000 sq ft
ReportingMonthly
Lead lender
Deutsche Pfandbriefbank
Size
approx. 355,000 sq ft
Standards
MaRisk · BCBS 239
Modules
Control
All case studies
Case Studies · Control

Four projects whose costs are tracked in real time in PROBIS Control.

From a data center to a hospital to a high-rise building in Berlin. Select a project to learn more about it.

Hanau Data Center
01 / 04
Hanau Data Center
Hanau
Case Study · Data Center

A data center with a total investment of 150 million EUR—completed within 2% of the budget.

Google’s data center in Hanau was developed by the NDC-GARBE joint venture and is located approximately 20 to 25 km from the DE-CIX Internet exchange in Frankfurt. The four-story facility covers approximately 10,000 m² and has an IT capacity of about 15 MW, with a total investment of approximately 150 million EUR. PROBIS was involved from the preparatory phase onward. Quality assurance, pro forma analysis, and cost controlling were in place from the very beginning, allowing commitments and expenditures to be continuously reconciled with the approved budget throughout the project’s duration. The project was completed on schedule and closed with a variance of approximately two percent from the approved budget.

Read the full project profile →
Investment Volumeapprox. 150 million EUR
IT Capacityapprox. 15 MW
Final Costs vs. Budgetwithin approximately 2%
Developer
NDC-GARBE
Size
approx. 10,000 m²
Location
Hanau
Modules
Control
Braunschweig Municipal Hospital
02 / 04
Braunschweig Hospital
Braunschweig
Case Study · Healthcare

A hospital with 1,499 beds, expanded based on a cost structure.

The expansion and renovation of the Braunschweig Municipal Hospital connects the new and existing buildings around a new entrance building. The hospital treats more than 61,000 inpatients annually. Turner & Townsend is responsible for the cost and commercial management of the project in PROBIS Control. Extensive process and interface technology, including a connection to thinkproject, keeps documents and costs continuously up to date.

Read the full project profile →
Beds1,499
Project area86,700 m²
Hospitals21
Cost Management
Turner & Townsend
Size
86,700 m²
Interface
thinkproject
Modules
Control
East Side Tower, Berlin
03 / 04
East Side Tower
Berlin-Friedrichshain
Case Study · Bank Monitoring

Five banks, up to 1,200 files, a reliable database.

The East Side Tower is a 142-meter-tall, 38-story high-rise in Berlin-Friedrichshain, designed by BIG, that houses Amazon’s European headquarters. Construction monitoring is being conducted in PROBIS on behalf of a consortium consisting of Deutsche Pfandbriefbank, Commerzbank, Helaba, Berlin Hyp, and Berliner Sparkasse. A project of this size can involve 20 to 100 participants and generate up to 1,200 files. Project-Clock provides the banks with centralized fund tracking, real-time risk detection, and AI-generated reports instead of disconnected spreadsheets.

Read the full project profile →
Tower height142 m
Banking Consortium5
Gross floor area80,500 m²
Financing
Consortium of 5 banks
Architecture
BIG
Projectiles
38
Modules
Control · Project Clock
ANNI, Munich
04 / 04
ANNI
Munich
Case Study · Office Revitalization

130 million euros, reported monthly in accordance with MaRisk and BCBS 239.

ANNI is a large office complex on St.-Martin-Straße in Munich. Originally built as a Siemens campus, it was designed by the “School of Richard Meier.” The project includes modernization, additional stories, and redesigned outdoor facilities, and is financed by a consortium led by Deutsche Pfandbriefbank. PROBIS provides ongoing construction monitoring and prepares monthly reports on costs, schedules, quality, and project organization that comply with the requirements of MaRisk and BCBS 239.

Read the full project profile →
Investment Volume€130 million
Total area of the complex33,000 m²
ReportingMonthly
Lead Arranger
Deutsche Pfandbriefbank
Size
33,000 m²
Standards
MaRisk · BCBS 239
Modules
Control
All Case Studies

Frequently Asked Questions

How does the invoice approval process work, specifically?

The invoice is uploaded or imported; its data is automatically recognized and assigned to a contract and a line item. It then goes through the workflow configured for that contract—which may be single- or multi-stage, with assigned teams. Approvers can view the amount, contract status, and budget impact before making their decision. Large volumes of standard invoices can be processed in a batch.

Can external parties, such as banks or financial controllers, be granted access?

Yes. Permissions are role-based and limited to the respective area. A bank or an external auditor is granted a defined view—typically fund disbursements, construction progress, and cost status—without access to the rest of the project.

Does the cash flow forecast update automatically?

Yes. It is derived from contract terms, the construction schedule, invoices received, and open items, and changes as soon as these factors change—not only when someone rebuilds the model.

What is the difference between Control and CAPEX/OPEX?

Same framework, different scope. Control manages the costs of a project during implementation; CAPEX/OPEX manages the multi-year capital and operating budgets for properties in your portfolio. Many customers use both: Projects are created from the CAPEX plan and then managed in Control.

Can we generate reports based on our own cost centers instead of DIN 276?

Yes. The data cube contains all attributes for each transaction. You can filter and analyze data by DIN 276 cost group, cost center, component, specialist planner, construction phase, contract, or custom fields—usually in combination.

Moving Forward in the Project Cycle

Please bring us your most recent expense report.

We'll show you how long it takes to create a report in PROBIS and what other information you would have seen there.

Security & Compliance

ISO 27001 certified. Built for institutional auditing.

Financial data for real estate projects must meet the requirements of lenders, investors, and regulatory authorities. Our risk management framework withstands even the most thorough scrutiny, going far beyond simple checklists.