Industry: Data Centers

Capacity, costs, and cooling—all in one cost structure.

A Google data center in Hanau, developed by the NDC-GARBE joint venture, with PROBIS involved from the project planning stage: cost planning, pro forma analysis, and cost control from the very beginning.

app.prob.is/portfolio
Data Centers
FAIR
Darmstadt, Germany
Control
Fraport Program Interface
Frankfurt am Main, Germany
Calculate
VINZENT, Munich
Munich, Germany
Control
Cologne-Porz Vocational College
Cologne, Germany
Calculate
2 %
Project completed within 2% of the budget for a data center with a total investment of €150 million
Calculate
Contract
Control
Manage
GENUINE CORPORATE PROGRAMS ON A TRIAL BASIS
THE CHALLENGES

Where data center budgets are decided.

The budget is determined during the project planning phase
By the time the steel arrives at the construction site, most of the relevant investment decisions have already been made—a pro forma based on assumptions rather than an actual cost structure is the wrong tool for this.
MW and m² must both add up
IT load capacity and floor space are negotiated jointly with the end user—a cost overrun in one area affects the cost-effectiveness of the other.
Proximity to the grid is a cost factor, not just a location decision
The distance to a node such as DE-CIX Frankfurt affects the assumptions regarding connectivity costs in the original business case.
The end user is not the developer
Google and NDC-GARBE need the same figures from two different perspectives—without having to reconcile two separate cost models.
THE PLATFORM

From the pro forma to the handover.

PROBIS is involved starting with the project preparation phase, ensuring that developers and end users see the same numbers.

1
Project Preparation

Calculate

Cost calculation based on quantity surveying, starting from the earliest planning stage.
Cost planning and pro forma estimates based on benchmarks, before the steel arrives on the construction site.
10,000 m²
Area of Google's first data center in Germany
2
Procurement

Contract

Contracts and commitments are tracked starting from the pre-construction phase, not from the first invoice.
Packages for structural work, finishing, energy, and cooling were evaluated prior to awarding the contract.
4
Projectiles developed by the NDC-GARBE joint venture in Hanau
3
Construction

Control

Forecast and actual figures are reconciled continuously, line item by line item.
Budget allocation and cost control in a single environment for developers and end users.
~20 km
to DE-CIX Frankfurt, a cost variable in the business case
4
Control

Manage

Ongoing asset and facility management once the project is operational.
Capacity, cost, and cooling are all derived from the same figures.
Oct. 2023
Launched, with all four PROBIS modules in use
A Cost Structure
The same numbers from the initial estimate to the final invoice. One database, one structure, no data transfers between tools.
Selected Project

A construction project, from start to finish.

Hanau, Germany
Google Data Center

Google's first in-house data center in Germany, developed by the NDC-GARBE joint venture in Hanau, was completed with a deviation of approximately 2% from the approved Capex.

View Project

Build a data center based on a static pro forma?