Industry & Infrastructure
Industry: Manufacturing & Infrastructure

New buildings alongside a line that never stands still.

Plant expansions, R&D centers, and corporate campuses are being built while production continues. PROBIS manages budgets, forecasts, and commitments for each location within a controlled structure.

app.prob.is/portfolio
Industry & Infrastructure
FAIR
Darmstadt, Germany
Control
Fraport Program Interface
Frankfurt am Main, Germany
Calculate
VINZENT, Munich
Munich, Germany
Control
Cologne-Porz Vocational College
Cologne, Germany
Calculate
1.000
Vehicles continue to roll off the assembly line at the BMW plant in Munich every day, even as it is being renovated
Calculate
Contract
Control
Manage
GENUINE CORPORATE PROGRAMS ON A TRIAL BASIS
THE CHALLENGES

Why factory projects can't pause production.

Construction While Operations Continue
Every crane, every work stoppage, and every connection must fit into the production schedule—cost decisions are made under precisely this constraint.
Multiple locations, multiple reporting practices
Each plant and each campus reports in its own way—a corporate-wide view begins with someone standardizing the formats.
Corporate Controlling Meets Construction Controlling
Financial data is managed in the ERP system, while construction is tracked through project reports. Without a common structure, the budget, commitments, and actual costs do not align.
Portfolio-wide expenses, visible only in retrospect
Without real-time visibility into portfolio-wide expenditures, large investment programs are subject to schedule and financial risks that only become apparent in hindsight.
THE PLATFORM

From the initial estimate to the final invoice.

Calculate, Contract, Control, and Manage track budgets, forecasts, and commitments for each location and consolidate all locations into a portfolio view.

1
Calculate

Calculate

Cost calculation based on quantity surveying, starting from the earliest planning stage.
Cost estimates for factory and campus construction projects that must fit into an ongoing production schedule.
€650 million
is investing in the transformation of the BMW Group plant in Munich
2
Procurement

Contract

Contracts and commitments are tracked starting from the pre-construction phase, not from the first invoice.
Packages are awarded based on benchmarks, with each one assigned to a specific budget line item at its location.
4
New buildings at the BMW plant in Munich, including body shop and vehicle assembly
3
Construction

Control

Forecast and actual figures are reconciled continuously, line item by line item.
Budget, commitments, and actual costs in a single structure, running in parallel with the ERP system.
~1.000
Vehicles continue to roll off the assembly line every day—even during the construction phase
4
Control

Manage

Ongoing asset and facility management once the project is operational.
All locations in a portfolio view, with expenses that appear as soon as they occur.
3.750
Residential Units in the New Siemensstadt Square Development
A Cost Structure
The same numbers from the initial estimate to the final invoice. One database, one structure, no data transfers between tools.
Selected Project

A construction project, from start to finish.

Expand a plant while production continues?