PROBIS
Book a demo
Hospitality
Industry: Hospitality

Hotel development within a cost structure.

Hotel Development and Repositioning – Real-time CAPEX and cost transparency from development through to operations, rather than fragmented, Excel-based reports exchanged between owners, operators, and project teams.

app.prob.is/portfolio
Hospitality
FAIR
Darmstadt, Germany
Control
Fraport Program Interface
Frankfurt am Main, Germany
Calculate
VINZENT, Munich
Munich, Germany
Control
Cologne-Porz Vocational College
Cologne, Germany
Calculate
+25 %
Greater liquidity, as reported by hotel investors and developers who use PROBIS
Calculate
Contract
Control
Manage
GENUINE CORPORATE PROGRAMS ON A TRIAL BASIS
THE CHALLENGES

Three teams, three versions of the truth.

Fragmented data, threefold
Development, operations, and asset management each keep their own records—and when they’re reconciled later, the data no longer matches.
Owners, operators, project team—three versions of the truth
Without a common cost structure, coordination between owners, operators, and project teams depends on someone manually reconciling three different spreadsheets.
Cash Flow and ROI: Only Visible in Hindsight
Limited real-time visibility into project costs, cash flow, and ROI means that decisions are made based on last month's figures, not this week's.
Manual reporting, delayed decisions
Manual, Excel-based reporting across all stakeholders means that decisions have to wait until someone has finished the spreadsheet—not the other way around.
THE PLATFORM

From development to operation.

The owner, operator, and project team work with a single cost and cash flow structure instead of three spreadsheets.

1
Calculate

Calculate

Cost calculation based on quantity surveying, starting from the earliest planning stage.
Development budgets based on benchmarks, before owners and operators approve them.
13,400 m²
Gross floor area of the Hotel Bellevue, Cortina d'Ampezzo
2
Procurement

Contract

Contracts and commitments are tracked starting from the pre-construction phase, not from the first invoice.
Commitments and obligations are assigned to the respective budget line item for development.
80
Rooms and Suites at the Hotel Bellevue
3
Construction

Control

Forecast and actual figures are reconciled continuously, line item by line item.
Real-time CAPEX and cash flow instead of last month's spreadsheet.
LEED Gold
Certification sought for the Hotel Bellevue
4
Control

Manage

Ongoing asset and facility management once the project is operational.
The owner, operator, and project team work with a cost structure that extends through the operational phase.
A Cost Structure
The same numbers from the initial estimate to the final invoice. One database, one structure, no data transfers between tools.
Selected Project

A construction project, from start to finish.

Take a hotel project from development all the way through to operation?