Contract · Award

The budget doesn't change when the bill arrives. It changes when you sign it.

PROBIS Contract covers all contract documents and agreements on both the cost and revenue sides. PROBIS Contract records the contract commitment where it belongs: at the moment of signature, under a designated cost group—visible to everyone who may need to answer questions about it later.

Get More Out of Your Existing ERP System

PROBIS integrates directly with SAP, MS Dynamics, Oracle, and Yardi and provides the key metrics you need—without disrupting your operations.

Package 07 40 — Facade — Award Decision · PROBIS Contract
Bid packageBiddersAwardContractChange orders
Budget line 07 40$9.46 million
Bids Received4
Recommended$8.34 million
Below budget−11.8%
Bid summary · excl. tax · USDBenchmark: facade, Chicago, Q2 2026
BidderTotal valuevs. benchmarkScoreStatus
Neumann Facade Systems, Inc.9,860,400
+4.2%
71.4Compliant
Steiner Metalworks, Inc.8,344,600
−11.8%
88.6Recommended
Curtainwall Partners LLC9,543,600
+0.9%
79.2Compliant
Alpina Enclosure Systems LLC10,077,100
+6.5%
64.82 items missing
Award value → budget line 07 408,344,600Commitment posted in the signature
ApproverL. Brandt · Contracts
Cover SheetGenerated
Contingency ImpactNone
✓

Award Approved

Steiner Metalworks · 07 40

$1.12 million under budget

L. Brandt · just now

Contract · Award

The budget doesn't change when the bill arrives. It changes when you sign it.

PROBIS Contract covers all contract documents and agreements on both the cost and revenue sides. PROBIS Contract records the contract commitment where it belongs: at the moment of signature, under a designated cost group—visible to everyone who may need to answer questions about it later.

Get More Out of Your Existing ERP System

PROBIS integrates directly with SAP, MS Dynamics, Oracle, and Yardi and provides the key metrics you need—without disrupting your operations.

Contract Award Unit KG 330 – Facade – Contract Award Decision · PROBIS Contract
Contract Award UnitBidderAwardContractAmendments
Budget KG 330€9.46 million
Offers4
Proposal€8.34 million
vs. budget−11.8%
Offer Overview · Net · EURBenchmark: Facade, Frankfurt am Main, Q2 2026
BidderTotal Bid Amountvs. benchmarkPointsStatus
Neumann Fassadentechnik, LLC9.860.400
+4,2 %
71,4Formally complete
Steiner Metallbau, LLC8.344.600
−11,8 %
88,6Recommended
Curtain Wall Partners GmbH & Co. KG9.543.600
+0,9 %
79,2Formally complete
Alpina Building Envelope, Inc.10.077.100
+6,5 %
64,82 positions are missing
Contract Amount — KG 3308.344.600The liability is recorded upon signature
ApprovalL. Brandt · Contracts
Award NoteCreated
Impact on Risk ReserveNone
✓

Contract Awarded

Steiner Metallbau GmbH · KG 330

€1.12 million under budget

L. Brandt · just now

how it works

Form an award unit
VE 03
Budget line item
Budget
✓
330 Concrete
1.240.000 €
✓
330 Masonry
860.000 €
340 Interior Walls
410.000 €
VE 03 · Structural Work
2.100.000 €
LV Position Level · 42 positions
01

Bundle

Create allocation units directly from the budget, either at the section level or at the bill of quantities line item level.

Request for Proposals VE 03
GAEB
↑
X83 on the platform
✓ Sent
Bidder
X84 Offer
Bau AG North
Imported
Hoch & Tief, LLC
Imported
Kern Bau KG
Pending
Bid deadline: November 14, 2026
02

Send

Send out the procurement documents or upload them to your procurement platform via GAEB (X83), and then import the bids (X84).

Price List VE 03
3 bidders
Bidder
Proposal
Item
Bau AG North
2.040.000 €
86
Highs & Lows
1.980.000 €
81
Kern Construction
2.310.000 €
64
Price
50 %
Quality
30 %
Date
20 %
✓ Recommended: Bau AG Nord · well-established
03

Rate

Evaluate against cost metrics and your weighted criteria. The rationale is documented.

Orders
Net
Contract
Budget
Commitment
Structural Work VE 03
2.10 million
2.04 million
Earthwork
0.62 million
0.58 million
Roof truss
0.25 million
0.25 million
Bau AG Nord · V-2026-031
New
✓ Commitment posted · Account 330
04

Award

The contract is created, and the commitment is immediately posted to the cost group.

Addendum N-07
Approved
Excess Reinforcement
Structural Work VE 03 · Bau AG Nord
+48.500 €
PL
→
BL
→
CEO
✓ 3 / 3
Forecast KG 330
2.088.500 €
▲ Updated to +48,500 € upon approval
05

Change Orders

Amendments go through the approval process and update the forecast upon approval.

how it works

Form an award unit
VE 03
Budget line item
Budget
✓
03 30 In-situ concrete
$1,426,000
✓
04 20 Masonry
$989,000
09 20 Drywall Construction
$471,500
VE 03 · Structural Work
$2,415,000
Position Level · 42 Positions
01

Bundle

Create allocation units directly from the budget, either at the section level or at the bill of quantities line item level.

Request for Proposals VE 03
AIA
↑
Documents on the Platform
✓ Sent
Bidder
Proposal
Northside Builders
Imported
Summit Concrete
Imported
Keystone Masonry
Pending
Bid Deadline: 11/14/2026 · G702/G703
02

Send

Send out procurement documents or make them available via your procurement platform, and import payment requests in accordance with the AIA-G702/G703 standard.

Price List VE 03
3 bidders
Bidder
Proposal
Item
Northside
$2,346,000
86
Summit
$2,277,000
81
Keystone
$2,656,500
64
Price
50%
Quality
30%
Date
20%
✓ Recommended: Northside · reasoned
03

Rate

Evaluate against cost metrics and your weighted criteria. The rationale is documented.

Orders
Net
Contract
Budget
Commitment
Structural Work VE 03
$2.42M
$2.35M
Earthwork
$0.71M
$0.67M
Roof truss
$0.29M
$0.29M
Northside Builders · V-2026-031
New
✓ Commitment posted · 03 30
04

Award

The contract is created, and the commitment is immediately posted to the cost group.

Addendum N-07
Approved
Excess Reinforcement
Structural Work VE 03 · Northside
+$55,800
PL
→
BL
→
CEO
✓ 3 / 3
Forecast 03 30
$2,401,800
▲ +$55,800 Updated upon approval
05

Change Orders

Amendments go through the approval process and update the forecast upon approval.

Where Procurement Processes Lose Money Today

Today

  • —Bids are compared in an Excel spreadsheet that is created specifically for a single contract award and then discarded afterward.
  • —“Is that a good price?” is answered based on experience and gut feeling.
  • —Add-ons are agreed upon during meetings and are not reconciled with the budget until weeks later—if at all.
  • —The outstanding balance—that is, the amount actually ordered—is compiled manually by someone every month.

With PROBIS

  • Each proposal is evaluated using the same evaluation matrix, and the matrix can be reused.
  • Prices are compared with benchmark figures from actual completed projects, broken down by trade and region.
  • An addendum is a workflow object: submitted, priced, reviewed, approved, or rejected—with a visible impact on the budget before anyone signs it.
  • The commitment is always up to date because it is generated directly from the awards.

A call for proposals with exactly the level of detail the package requires

  • Section-Based Contracting Units for General Contractor and Turnkey Contractor Contracts
  • Reusable Templates by Package Type
  • Combine GU and individual contracts within the same project when the strategy changes
Bid package structure — package tree · MasterFormat
StrategyMixed
Packages11 defined
TemplateTrade · facade
GC package · section level$45.32 million
  • P-01 Core & Shell (GC)45,320,000
  • Section 1 · General Conditions & Mobilization1,628,000
  • Section 2 · Substructure8,734,000
  • Section 3 · Superstructure20,086,000
  • Section 4 · Roof3,971,000
  • Section 5 · Interior Fit-Out7,425,000
  • Section 6 · Allowances3,476,000
  • Priced by section · no line-item SOV6 sections
Trade package · line-item level$9.46 million
  • P-07 Facade (direct)9,460,000
  • 07 40 00 Exterior Walls & Cladding7,634,000
  • 08 44 13 Unitized curtain wall5,632,000
  • · 44,993 sq ft @ 125.195,632,674
  • 08 51 00 Windows1,298,000
  • 10 71 13 Sun control devices704,000
  • 07 50 00 Roofing & Parapets1,199,000
  • 01 50 00 Miscellaneous work627,000

Compare offers based on facts, not impressions

  • Benchmark Comparison with Market and Project Metrics
  • Automatic validation and completeness checks for all bids
  • Weighted Evaluation Matrix with Your Own Criteria
  • Complete and audit-proof documentation of the bid evaluation in accordance with the requirements for competitive procurement procedures (e.g., FAR and state and local procurement regulations).
Bid evaluation — weighted matrix · P-07 Facade
Criterion · weightNeumannSteinerCurtain wallAlpina
Price · 50%32.048.539.528.0
Schedule · 20%15.017.016.013.0
Quality · 20%16.415.116.714.8
References · 10%8.08.07.09.0
Weighted score71.488.679.264.8
Plausibility checks2 flags · 1 bidder incomplete
08 51 00 Windows · Steiner
$42.11/sq ft compared to a benchmark range of $69.48–$92.98/sq ft
Low · verify scope
10 71 13 Sun control devices · Alpina
No price listed — 2 items returned no results
Incomplete
Benchmark setFacade · CHI
Evaluators3 approved
Audit trailComplete

Contracts and amendments that remain tied to the budget

  • Central contract registry with versioning and a complete change history
  • Amendment management in accordance with AIA A201—General Contract Terms—with defined review and approval steps.
  • Contract line items with status, values, forecasts, and dates
  • Budget Allocation and Transfer Between Contracts and Cost Groups
Contract register — 5 of 11 contracts · excluding tax · USD
ContractStatusOriginalChange ordersCurrent totalVer.
C-01 Core & Shell (GC)Signed45,320,000+2,029,50047,349,500v4
C-03 Site Work & ExcavationComplete3,828,000+138,6003,966,600v2
C-07 FacadeAwarded8,344,600—8,344,600v1
C-08 MEP — HVACSigned13,134,000+673,20013,807,200v3
C-09 ElevatorsUnder review2,541,000−92,4002,448,600v2
Committed to date 73,167,600+2,748,90075,916,500
CO-14 · C-01 · Additional core wall reinforcementPending approval
Value +$349,800Cost code 07 40 00Contingency after $1.56MForecast impact +0.4%

A call for proposals with exactly the level of detail the package requires

  • Section-Based Contracting Units for General Contractor and Turnkey Contractor Contracts
  • Bid line items with DIN 276 and GAEB integration for individual awarding by trade
  • Reusable Templates by Package Type
  • Combine GU and individual contracts within the same project when the strategy changes
Structure of Allocation Units – Package Tree · DIN 276
StrategyMixed
Packages11 defined
TemplateTrades · Facade
GU Package · Section Level€45.32 million
  • P-01 Structural Work & Building Envelope (General Contractor)45,320,000
  • Section 1 · Construction Site Facilities & General Information1,628,000
  • Section 2 · Foundation & Substructure8,734,000
  • Section 3 · Shell Construction & Structural System20,086,000
  • Section 4 · Roof3,971,000
  • Section 5 · Interior Finishing7,425,000
  • Section 6 · Lump Sums & Contingency Items3,476,000
  • Priced by sections—no bill of quantities at the line item level6 sections
Trade Package · Specification Item Level€9.46 million
  • P-07 Facade (Individual Contract)9,460,000
  • KG 330 Exterior Walls&7,634,000
  • KG 337 Modular Curtain Wall5,632,000
  • · 4,180 m² × 1,347.53 €5,632,674
  • KG 334 Exterior Wall Openings (Windows)1,298,000
  • KG 338 Sun Protection704,000
  • KG 360 Roofs & Parapets1,199,000
  • KG 390 Other Measures627,000

Compare offers based on facts, not impressions

  • Benchmark Comparison with Market and Project Metrics
  • Automatic validation and completeness checks for all bids
  • Weighted Evaluation Matrix with Your Own Criteria
  • Complete documentation of the evaluation—audit-proof and suitable for public procurement in accordance with VgV / VOB/A
Bid Evaluation – Weighted Matrix · P-07 Facade
Criterion · WeightingNeumannSteinerCurtain Wall PartnersAlpina
Price · 50%32,048,539,528,0
Dates · 20%15,017,016,013,0
Quality · 20%16,415,116,714,8
References · 10%8,08,07,09,0
Weighted score71,488,679,264,8
Validation Check2 notes · 1 bidder incomplete
KG 334 Windows · Steiner
453 €/m² with a benchmark range of 748–1,001 €/m²
Notably low · Check the scope
KG 338 Sun Protection · Alpina
Not priced – 2 empty positions
Incomplete
Benchmark SetFacade · FFM
Reviewer3 approved
Audit TrailComplete

Contracts and amendments that remain tied to the budget

  • Central contract registry with versioning and a complete change history
  • Contract line items with status, values, forecasts, and dates
  • Change Order Management in Accordance with VOB/B, Including Defined Review and Approval Steps
  • Budget Allocation and Transfer Between Contracts and Cost Groups
Contract Register – 5 of 11 contracts · net · EUR
ContractStatusContract AmountChange OrdersCurrent TotalVerse.
C-01 Structural Work & Building Envelope (General Contractor)Signed45.320.000+2.029.50047.349.500v4
C-03 Excavation & EarthworkCompleted3.828.000+138.6003.966.600v2
C-07 FacadeAward8.344.600—8.344.600v1
C-08 TGA – Ventilation and Air ConditioningSigned13.134.000+673.20013.807.200v3
C-09 Elevator SystemsUnder review2.541.000−92.4002.448.600v2
Still in office today 73.167.600+2.748.90075.916.500
N-14 · C-01 · Additional Reinforcement for Core WallsApproval pending
Value: +349,800 €Cost Group KG 330Risk reserve thereafter: 1.56 million €Impact on forecast: +0.4%
Commitment
Commitment Control

Keep track of what you've commissioned— not just what you've paid for.

If 78% of the budget has already been committed to contracts after 62% of the construction period, you'll see it right away.

Allocated vs. Budget by Cost Group.

Allocations to the risk reserve.

Dashboards showing the progress of contract awards.

Cost codeBudgetAwardedChange ordersUnawarded% awarded
03–09 Shell & Core49.5942.48+2.047.11
86%
07 40 00 Exterior walls9.467.38+0.002.08
78%
21–28 MEP & Systems12.968.16+0.674.80
63%
31–33 Site Work & Utilities1.090.00—1.09
0%
01 Soft Costs & Fees6.674.66+0.042.01
70%
Commitment
Commitment Control

Know what you signed up for— not just what you paid for.

If 78% of the budget has been allocated by the 62% mark of the construction period, you'll see it the very day it happens.

Allocated vs. Budget by Cost Group.

Allocations to the risk reserve.

Dashboards showing the progress of contract awards.

Cost GroupBudgetAwardChange OrdersNot awarded% awarded
KG 300 Building Structures49,5942,48+2,047,11
86%
KG 330 Exterior Walls9,467,38+0,002,08
78%
KG 400 Technical Systems12,968,16+0,674,80
63%
KG 500 Outdoor Facilities1,090,00—1,09
0%
KG 700 Incidental Construction Costs6,674,66+0,042,01
70%
In Out
PROBIS contract Live
Approved budget from Calculate
Bids from bidding platforms
Contract records via Excel import
Market and trade benchmark data
Commitment Position in Control
Payment Forecast in Cash Flow
Award documentation for audit
Procurement dashboards
budget bids contracts benchmarks budget →commitment bids →payment forecast contracts →award package benchmarks →dashboards
In Out
PROBIS contract Live
Approved budget from Calculate
Bids from bidding platforms
Contract records via Excel import
Market and trade benchmark data
Commitment Position in Control
Payment Forecast in Cash Flow
Award documentation for audit
Procurement dashboards
budget bids contracts benchmarks budget →commitment bids →payment forecast contracts →award package benchmarks →dashboards

Also in Contract

Integration with Procurement Platforms

Export bidding documents; import bids without having to retype them.

Role-Based Procurement Process

Purchasing, Inspection, Approval—each with its own set of permissions.

Security Retentions and Guarantees

Tracked by contract with return dates.

Contract Import

Import existing contract data using a template file.

Impact on Liquidity

A signed contract immediately changes the payment forecast.

Payment Terms and Schedules

For each contract, including handover to Control and liquidity planning.

Contract History

Every version of every contracting unit and every contract, including the author.

Templates for Award Notices

Standardized award documentation for review, approval, and audit.

Contracts in Foreign Currency

For cross-border projects and portfolios.

Case Studies · Contract

Four projects in which each contract award depends on the budget.

From the airport terminal to the Allianz Arena to the logistics center. Select a project to learn more about it.

Terminal A-Plus, Frankfurt Airport
01 / 04
Terminal A-Plus
Frankfurt am Main
Case Study · Airport Terminal

A terminal with 180,000 m² of gross floor area—awarded in individual lots.

Frankfurt Terminal A-Plus is a new airport terminal being built through a multi-stage procurement strategy—the procurement lots are awarded in stages based on a uniform, standardized cost structure. PROBIS handles bid evaluation, contract award, and amendment history, ensuring that the commitment is up to date on the day a contract is signed, rather than only at the end of the month.

Read the full project profile →
Gross Floor Area180,000 m²
Cost StructureStandardized
Commitment TrackingLive
Procurement Strategy
Multiple packages
Size (Gross Floor Area)
180,000 m²
Cost Structure
Standardized
Modules
Contract
Allianz Arena, Munich
02 / 04
Allianz Arena
Munich
Case Study · Sports & Event Venues

75,024 seats, with every order placed on a single platform.

The Allianz Arena opened in 2005 after less than three years of construction—featuring seven levels and 75,024 seats for national matches. PROBIS manages the arena and the FC Bayern Campus on a single platform. Procurement processes, invoice verification, and batch approvals are handled in the same system as CAPEX planning, budget control, and fund tracking. Every purchase order for either location is thus posted against the budget to which it belongs and appears in the same reporting system the club uses to manage both assets.

Read the full project profile →
Seats75,024
Bauzeit< 3 Jahre
Assets on a single platform2
Opening
2005
Layers
7
Assets
Arena · FC Bayern Campus
Modules
Contract
St. Raphael School, Frankfurt am Main
03 / 04
St. Raphael School
Frankfurt am Main
Case Study · Education

A school for 810 students, with every allocation based on the budget.

MW gemeinnützige GmbH is building the St. Raphael School, a new Catholic high school on Ludwig-Landmann-Straße in Frankfurt—complete with a cafeteria, gym, specialized classrooms, and a chapel open to the neighborhood. For a nonprofit client, every contract award must be justifiable and every change must be traceable. PROBIS Contract tracks contracts and commitments starting from the project preparation phase—rather than only from the first invoice—throughout the entire construction period from 2022 to 2024.

Read the full project profile →
Students810
Lot area12,335 m²
Time Period2022–2024
Client
MW Non-profit GmbH
Size
12,335 m²
Time period
2022–2024
Modules
Contract
LogPlaza Gladbeck
04 / 04
LogPlaza Gladbeck
Gladbeck
Case Study · Logistics

Three warehouses, 23 loading docks—the workload was evident from day one.

Mailänder Consult developed LogPlaza Gladbeck on a 26,000 m² lot on Beisenstraße. The logistics center comprises three warehouses with 15,000 m² of sprinklered storage space, air-conditioned offices, 23 loading docks, and charging stations for electric cars and e-bikes. In a fast-paced construction project with tight margins, what’s been signed counts more than what’s been paid. PROBIS Contract tracked contracts and commitments from the project preparation phase through the entire implementation period in 2022–2023.

Read the full project profile →
Land area26,000 m²
Docking stations23
Time Period2022–2023
Client
Mailänder Consult
Storage space
15,000 m²
Time period
2022–2023
Modules
Contract
All Case Studies
Case Studies · Contract

Four projects in which each contract award depends on the budget.

From the airport terminal to the Allianz Arena to the logistics center. Select a project to learn more about it.

Terminal A-Plus, Frankfurt Airport
01 / 04
Terminal A-Plus
Frankfurt am Main
Case Study · Airport Terminal

A terminal with 180,000 m² of gross floor area—awarded in individual lots.

Frankfurt Terminal A-Plus is a new airport terminal being built through a multi-stage procurement strategy—the procurement lots are awarded in stages based on a DIN 276 cost structure. PROBIS handles bid evaluation, contract award, and amendment history, ensuring that the commitment is up to date on the day a contract is signed, rather than only at the end of the month.

Read the full project profile →
Gross Floor Area180,000 m²
Cost StructureDIN 276
Commitment TrackingLive
Procurement Strategy
Multiple packages
Size (Gross Floor Area)
180,000 m²
Cost Structure
DIN 276
Modules
Contract
Allianz Arena, Munich
02 / 04
Allianz Arena
Munich
Case Study · Sports & Event Venues

75,024 seats, with every order placed on a single platform.

The Allianz Arena opened in 2005 after less than three years of construction—featuring seven levels and 75,024 seats for national matches. PROBIS manages the arena and the FC Bayern Campus on a single platform. Procurement processes, invoice verification, and batch approvals are handled in the same system as CAPEX planning, budget control, and fund tracking. Every purchase order for either location is thus posted against the budget to which it belongs and appears in the same reporting system the club uses to manage both assets.

Read the full project profile →
Seats75,024
Bauzeit< 3 Jahre
Assets on a single platform2
Opening
2005
Layers
7
Assets
Arena · FC Bayern Campus
Modules
Contract
St. Raphael School, Frankfurt am Main
03 / 04
St. Raphael School
Frankfurt am Main
Case Study · Education

A school for 810 students, with every allocation based on the budget.

MW gemeinnützige GmbH is building the St. Raphael School, a new Catholic high school on Ludwig-Landmann-Straße in Frankfurt—complete with a cafeteria, gym, specialized classrooms, and a chapel open to the neighborhood. For a nonprofit client, every contract award must be justifiable and every change must be traceable. PROBIS Contract tracks contracts and commitments starting from the project preparation phase—rather than only from the first invoice—throughout the entire construction period from 2022 to 2024.

Read the full project profile →
Students810
Lot area12,335 m²
Time Period2022–2024
Client
MW Non-profit GmbH
Size
12,335 m²
Time period
2022–2024
Modules
Contract
LogPlaza Gladbeck
04 / 04
LogPlaza Gladbeck
Gladbeck
Case Study · Logistics

Three warehouses, 23 loading docks—the workload was evident from day one.

Mailänder Consult developed LogPlaza Gladbeck on a 26,000 m² lot on Beisenstraße. The logistics center comprises three warehouses with 15,000 m² of sprinklered storage space, air-conditioned offices, 23 loading docks, and charging stations for electric cars and e-bikes. In a fast-paced construction project with tight margins, what’s been signed counts more than what’s been paid. PROBIS Contract tracked contracts and commitments from the project preparation phase through the entire implementation period in 2022–2023.

Read the full project profile →
Land area26,000 m²
Docking stations23
Time Period2022–2023
Client
Mailänder Consult
Storage space
15,000 m²
Time period
2022–2023
Modules
Contract
All Case Studies

Frequently Asked Questions

Can general contractor and individual trade awards be used within the same project?

Yes. Award units can be structured by sections for general contractor services and by bid specification items for individual awards—all within the same project. This is particularly important when the award strategy changes during the course of a project.

How does the benchmark comparison work?+

Incoming bids are compared with benchmark figures from completed projects—adjusted for region, property type, and the Federal Statistical Office’s construction price index. Unusually high or low trade prices are flagged in this way and are not accepted without review.

Will PROBIS replace our procurement platform?+

Not necessarily. Tender documents can be transferred to external procurement platforms via GAEB, and the bids received can be retrieved for evaluation. The platform your bidders are already using will remain in place.

How are addenda approved?+

Through a configurable workflow: submitted, priced, reviewed, and approved or rejected by designated roles—every step is logged. The budget impact is calculated and displayed before the approval decision is made, not after.

Let's see how much of the budget hasn't been allocated yet?+

Yes—by cost category and for the project as a whole. Comparing the unallocated budget with the progress of construction is one of the earliest reliable indicators that a project is getting out of hand.