New Terminal, Jorge Chávez International Airport, Lima
Lima, Peru
·
Airport
Project

Terminal. Runway. Control tower. Estimated based on real-world benchmarks.

For the modernization of Jorge Chávez International Airport, PROBIS estimated the costs for three packages: a new terminal, a second runway, and a new control tower. The estimates were based on the benchmarking module, which compares each package with similar airport projects.

app.prob.is/airports/lima/benchmarking
Overview
Invoices
Exam
Approval
Costs
Report
Budget
€104.5M
Commissioned
€101.3M
Billed
€66.9M
Forecast Variance
+1.2%
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Incoming Invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Gross Amount
184,200.00 €
Service Period
09/2026
✓ Data detected
→ Assigned to a contract
Cash Flow Statement
Plan · Actual · Outflow
M1
M6
M12
M18
M24
Costs
2 out of 4 within budget
PackageBudgetProgramStatus
Structural Work & Core€38.2M€38.0MWithin budget
Facade€14.6M€15.3MAudit
TGA€27.9M€28.4MAudit
Expansion€16.4M€16.4MWithin budget
Projected cost upon completion: €105.8 million. Illustrative screenshot with fictitious demo data.
Cost per square meter
€3,480
Benchmark
€3,410
Cost Items
312
Comparative Projects
18
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Estimate vs. Median
Structural Work
Facade
TGA
Expansion
Estimate
Median
Cost per square meter vs. comparable projects
18 projects
Low
Median
High
Cost Groups
3 out of 4 within the framework
Cost GroupEstimateMedianStatus
Structural Work & Core€38.2M€37.6MAs part of
Facade€14.6M€13.4MAbove
TGA€27.9M€27.1MAs part of
Expansion€16.4M€16.9MAs part of
Estimated value: €104.5 million, benchmarked against 18 comparable projects. Illustrative screenshot with fictitious demo data.
Projects
4
Total Budget
€412M
Early Warnings
2
Funding Coverage
96%
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Early Warning
New
EW-2026-007
Riverside Campus · TGA Package
Forecast Variance
+7.1%
Responsible
Project Management
Decision Due
November 2026
✓ Automatically selected
→ Assigned to the person in charge
Budget per Project
Budget · Forecast
Northwind
Harbor
Elm St
Riverside
Portfolio
2 Early Warnings
ProjectBudgetVarianceStatus
Northwind Yards€104.5M+1.2%Within budget
Harbor Point€138M+3.8%Audit
Elm Street Lofts€61M−0.4%Within Budget
Riverside Campus€108M+7.1%Early Warning
Two early warnings triggered, each with a designated person in charge and a decision deadline. Illustrative screenshot with fictitious demo data.
Bids Received
5
Budget line item
€14.6M
Lowest vs. Budget
−3.4%
Change Orders
6
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Change Orders
2 new
CO-2026-016
Facade Package · Meridian Facades
Reason
Change to the Glazing Specifications
Amount
+124,000.00 €
Recorded so far
6 · 420,000 €
✓ Within the budget line item
→ Awaiting approval
Bids vs. Budget Line Item
€14.6M Budget
Commandment 1
Commandment 3
Commandment 5
Award of the Facade Contract Package
Awarded for €14.3M
BidderBidvs. BudgetStatus
Alder Facades€14.1M−3.4%Non-compliant
Meridian Facades€14.3M−2.1%Awarded
Kestrel Envelope€14.8M+1.4%Shortlist
Norland Glass€15.9M+8.9%Rejected
Contracts awarded for €14.3 million against a budget allocation of €14.6 million. Illustrative screenshot with fictitious sample data.
Lima Airport Partners
Customer
Calculate
Control
Manage
The Project

The Project in Numbers.

As a Fraport subsidiary, LAP’s figures had to be seamlessly integrated into the Group’s reporting rather than standing alone. PROBIS consolidates the three packages into a single view and offers LAP the same AI features listed on its own customer-facing page: risk analysis & early warning system, as well as AI-powered benchmarking.

The modernization of Jorge Chávez International Airport was carried out in three parallel, interdependent phases rather than as a single linear construction project: a new passenger terminal, a second runway, and a new control tower. The second runway and the control tower began operations in April 2023, and the new terminal opened in June 2025—together representing an investment of approximately $1.5–2 billion.

Location
Lima, Peru
Time period
Asset Class
Airport
Scope
Three parallel packages, consolidated into a single view that feeds into the Fraport Group's reporting.
  • 3 Parallel Packages
  • $1.5–2 billion total investment
On the platform

The modules behind this project.

The PROBIS modules used in this project, displayed on illustrative screens with sample data.

Calculate
Cost calculation based on quantity surveying, starting from the earliest planning stage.
Control
Forecast and actual figures are reconciled continuously, line item by line item.
Manage
Ongoing asset and facility management once the project is operational.
app.prob.is/projects/
new-terminal-jorge-chavez-international-airport-lima
Overview
Invoices
Exam
Approval
Costs
Report
Budget
€104.5M
Commissioned
€101.3M
Billed
€66.9M
Forecast Variance
+1.2%
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Incoming Invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Gross Amount
184,200.00 €
Service Period
09/2026
✓ Data detected
→ Assigned to a contract
Cash Flow Statement
Plan · Actual · Outflow
M1
M6
M12
M18
M24
Costs
2 out of 4 within budget
PackageBudgetProgramStatus
Structural Work & Core€38.2M€38.0MWithin budget
Facade€14.6M€15.3MAudit
TGA€27.9M€28.4MAudit
Expansion€16.4M€16.4MWithin budget
Projected cost upon completion: €105.8 million. Illustrative screenshot with fictitious demo data.
Cost per square meter
€3,480
Benchmark
€3,410
Cost Items
312
Comparative Projects
18
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Estimate vs. Median
Structural Work
Facade
TGA
Expansion
Estimate
Median
Cost per square meter vs. comparable projects
18 projects
Low
Median
High
Cost Groups
3 out of 4 within the framework
Cost GroupEstimateMedianStatus
Structural Work & Core€38.2M€37.6MAs part of
Facade€14.6M€13.4MAbove
TGA€27.9M€27.1MAs part of
Expansion€16.4M€16.9MAs part of
Estimated value: €104.5 million, benchmarked against 18 comparable projects. Illustrative screenshot with fictitious demo data.
Bids Received
5
Budget line item
€14.6M
Lowest vs. Budget
−3.4%
Change Orders
6
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Change Orders
2 new
CO-2026-016
Facade Package · Meridian Facades
Reason
Change to the Glazing Specifications
Amount
+124,000.00 €
Recorded so far
6 · 420,000 €
✓ Within the budget line item
→ Awaiting approval
Bids vs. Budget Line Item
€14.6M Budget
Commandment 1
Commandment 3
Commandment 5
Award of the Facade Contract Package
Awarded for €14.3M
BidderBidvs. BudgetStatus
Alder Facades€14.1M−3.4%Non-compliant
Meridian Facades€14.3M−2.1%Awarded
Kestrel Envelope€14.8M+1.4%Shortlist
Norland Glass€15.9M+8.9%Rejected
Contracts awarded for €14.3 million against a budget allocation of €14.6 million. Illustrative screenshot with fictitious sample data.
Projects
4
Total Budget
€412M
Early Warnings
2
Funding Coverage
96%
New Terminal, Jorge Chávez International Airport, Lima
New Terminal, Jorge Chávez International Airport, Lima
Early Warning
New
EW-2026-007
Riverside Campus · TGA Package
Forecast Variance
+7.1%
Responsible
Project Management
Decision Due
November 2026
✓ Automatically selected
→ Assigned to the person in charge
Budget per Project
Budget · Forecast
Northwind
Harbor
Elm St
Riverside
Portfolio
2 Early Warnings
ProjectBudgetVarianceStatus
Northwind Yards€104.5M+1.2%Within budget
Harbor Point€138M+3.8%Audit
Elm Street Lofts€61M−0.4%Within Budget
Riverside Campus€108M+7.1%Early Warning
Two early warnings triggered, each with a designated person in charge and a decision deadline. Illustrative screenshot with fictitious demo data.
Calculate
Control
Manage
The Customer
Lima Airport Partners

Lima Airport Partners is the Fraport-controlled concession operator of Jorge Chávez International Airport in Lima, Peru, and holds the operating concession through 2041.

View Customer

Managing an airport construction project using spreadsheets?

Would you like to have the same level of control on your next project?