Two rail lines, one regional network.

Regionaltangente West: a two-line rail infrastructure program connecting Bad Homburg, Neu-Isenburg, Frankfurt-Praunheim, Bad Soden, and Dreieich-Buchschlag.

app.prob.is/infrastructure/rtw

Regional Tangent West · Control View

PROBIS Control · indicative figures
  • 2 Raillines
PackageBudgetVarianceStatus
North Line Tunneling€650M−1.5%On budget
South Line Stations€420M+7.1%Review
Signaling & Systems€180M0.0%On budget
Rolling Stock & Depot€150M0.0%On budget

These are indicative figures only, based on published project information. They are not actual PROBIS project data.

Overview
Invoices
Exam
Approval
Costs
Report
Rail lines
2
Regional tangent West, Frankfurt
Incoming invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Large amount
184,200.00 €
Service period
09/2026
✓ Data detected
→ Assigned to a contract
Cash-out plan
Plan · Actual · Outflow
2017
2019
2021
2023
2026
Costs
3 of 4 within budget
Package
Budget
Forecast
Status
North Line Tunneling
€650M
€640M
On budget
South Line Stations
€420M
€450M
Review
Signaling & Systems
€180M
€180M
On budget
Rolling Stock & Depot
€150M
€150M
On budget

Illustrative only — figures are fictional and do not represent the program's actual line-item data.

RTW
Client
Control
Calculate
Contract
The project

The project, by the numbers.

Regionaltangente West: a two-line rail infrastructure program connecting Bad Homburg, Neu-Isenburg, Frankfurt-Praunheim, Bad Soden, and Dreieich-Buchschlag.

The Regionaltangente West will consist of two lines that converge in the central area: Bad Homburg to Neu-Isenburg Birkengewann, and Frankfurt-Praunheim/Bad Soden to Dreieich-Buchschlag.

Location
Frankfurt am Main, Germany
Timeframe
2025
Asset class
Infrastructure
Scope
Cost Management with PROBIS Control, Calculate, and Contract.
Client
RTW
  • 2 rail lines
On the platform

The modules behind this project.

The PROBIS modules used in this project, shown on sample screens with demo data.

Control
Forecast and actual figures are reconciled continuously, line item by line item.
Calculate
Cost calculation based on quantity surveying, starting from the earliest planning stage.
Contract
Contracts and commitments are tracked starting from the pre-construction phase, not from the first invoice.
app.prob.is/projects/
Regional Tangent West Frankfurt

Regional Tangent West · Control View

PROBIS Control · indicative figures
  • 2 Raillines
PackageBudgetVarianceStatus
North Line Tunneling€650M−1.5%On budget
South Line Stations€420M+7.1%Review
Signaling & Systems€180M0.0%On budget
Rolling Stock & Depot€150M0.0%On budget

These are indicative figures only, based on published project information. They are not actual PROBIS project data.

app.prop.is/projects/northwind-yards

Northwind Yards · Expected completion date

PROBIS Control · Demo Data
  • $104.5M Budget
  • $101.3M Committed
  • $66.9 million invoiced
  • +1.2% Forecastvariance
PackageBudgetForecastStatus
Shell & Core$38.2M$38.0MOn budget
Facade$14.6M$15.3MReview
MEP$27.9M$28.4MReview
Fit-out$16.4M$16.4MOn budget

Projected total upon completion: $105.8 million. Sample screen with fictional demo data.

Control
Calculate
Contract
The client
RTW

RTW Planungsgesellschaft is delivering the Regionaltangente West, a two-line regional rail program connecting Bad Homburg, Neu-Isenburg, Frankfurt-Praunheim, Bad Soden, and Dreieich-Buchschlag.

View client

Expanding a plant while production continues?

Want the same level of control on your next project?