Bank-wide Credit Monitoring
Munich, Germany
·
Mix
Project

All project developer financing, in one system.

A system for all project developer financing needs, featuring fund utilization monitoring, drawdown management, and AI-powered reporting.

Overview
Invoices
Exam
Approval
Costs
Report
Budget
€104.5M
Committed
€101.3M
Invoiced
€66.9M
Forecast var.
+1.2%
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Incoming invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Large amount
184,200.00 €
Service period
09/2026
✓ Data detected
→ Assigned to a contract
Cash-out plan
Plan · Actual · Outflow
M1
M6
M12
M18
M24
Costs
2 of 4 within budget
PackageBudgetEst.Status
Shell & Core€38.2M€38.0MOn budget
Facade€14.6M€15.3MReview
MEP€27.9M€28.4MReview
Fit-out€16.4M€16.4MOn budget
Projected total upon completion: €105.8 million. Sample screen with fictional demo data.
Cost per square meter
€3,480
Benchmark
€3,410
Cost items
312
Comparables
18
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Estimate vs. Median
Shell
Facade
MEP
Fit-out
Estimate
Median
Cost per square meter vs. comparables
18 projects
Low
Median
High
Cost Groups
3 of 4 within range
Cost GroupEstimateMedianStatus
Shell & Core€38.2M€37.6MWithin range
Facade€14.6M€13.4MAbove
MEP€27.9M€27.1MWithin range
Fit-out€16.4M€16.9MWithin range
Estimated at €104.5 million, benchmarked against 18 comparable projects. Illustrative screen with fictional demo data.
Projects
4
Total budget
€412M
Early warnings
2
Funding cover
96%
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Early warning
New
EW-2026-007
Riverside Campus · MEP Package
Forecast drift
+7.1%
Owner
Project Lead
Decision due
November 2026
✓ Flagged automatically
→ Assigned to an owner
Budget by Project
Budget · Forecast
Northwind
Harbor
Elm St
Riverside
Portfolio
2 early warnings
ProjectBudgetVarianceStatus
Northwind Yards€104.5M+1.2%On budget
Harbor Point€138M+3.8%Review
Elm Street Lofts€61M−0.4%On budget
Riverside Campus€108M+7.1%Early warning
Two early warnings were issued, each with a designated owner and a decision date. Sample screen with fictional demo data.
Bids Received
5
Budget line
€14.6M
Lowest vs. budget
−3.4%
Change orders
6
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Change orders
2 new
CO-2026-016
Facade Package · Meridian Facades
Reason
Glazing Specification Change
Amount
+124,000.00 €
Tracked to date
6 · 420,000 €
✓ Within the budget line
→ Pending approval
Bids vs. Budget Line
€14.6 million budget
Bid 1
Bid 3
Bid 5
Facade Package Award
Awarded €14.3 million
BidderBidvs. budgetStatus
Alder Facades€14.1M−3.4%Non-compliant
Meridian Facades€14.3M−2.1%Awarded
Kestrel Envelope€14.8M+1.4%Shortlist
Norland Glass€15.9M+8.9%Declined
Awarded €14.3 million against a budget line of €14.6 million. Illustrative screen with fictional demo data.
Münchner Hyp
Client
Control
Manage
Calculate
The project

The project, by the numbers.

A system for all project developer financing needs, featuring fund utilization monitoring, drawdown management, and AI-powered reporting.

A system for all project developer financing needs, featuring fund utilization monitoring, drawdown management, and AI-powered reporting. Connected via a data interface and a payment interface, ensuring that approval decisions and disbursements are based on the same verified data. Complete PROBIS module package for lenders.

Location
Munich, Germany
Timeframe
Asset class
Mix
Scope
Funds-Use Monitoring, Drawdown Management, and AI-Powered Reporting for All Project Developer Financing.
Client
Münchner Hyp
  • 2 Interfaces: Data and Payments
On the platform

The modules behind this project.

The PROBIS modules used in this project, shown on sample screens with demo data.

Control
Forecast and actual figures are reconciled continuously, line item by line item.
Manage
Ongoing asset and facility management once the project is operational.
Calculate
Cost calculation based on quantity surveying, starting from the earliest planning stage.
app.prob.is/projects/
Munich-Hyp-Bank-Wide-Lender-Monitoring
Overview
Invoices
Exam
Approval
Costs
Report
Budget
€104.5M
Committed
€101.3M
Invoiced
€66.9M
Forecast var.
+1.2%
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Incoming invoices
New
RE-2026-0418
Rohbau Nord GmbH · PDF
Contract
300.01 Structural Work
Large amount
184,200.00 €
Service period
09/2026
✓ Data detected
→ Assigned to a contract
Cash-out plan
Plan · Actual · Outflow
M1
M6
M12
M18
M24
Costs
2 of 4 within budget
PackageBudgetEst.Status
Shell & Core€38.2M€38.0MOn budget
Facade€14.6M€15.3MReview
MEP€27.9M€28.4MReview
Fit-out€16.4M€16.4MOn budget
Projected total upon completion: €105.8 million. Sample screen with fictional demo data.
Cost per square meter
€3,480
Benchmark
€3,410
Cost items
312
Comparables
18
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Estimate vs. Median
Shell
Facade
MEP
Fit-out
Estimate
Median
Cost per square meter vs. comparables
18 projects
Low
Median
High
Cost Groups
3 of 4 within range
Cost GroupEstimateMedianStatus
Shell & Core€38.2M€37.6MWithin range
Facade€14.6M€13.4MAbove
MEP€27.9M€27.1MWithin range
Fit-out€16.4M€16.9MWithin range
Estimated at €104.5 million, benchmarked against 18 comparable projects. Illustrative screen with fictional demo data.
Bids Received
5
Budget line
€14.6M
Lowest vs. budget
−3.4%
Change orders
6
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Change orders
2 new
CO-2026-016
Facade Package · Meridian Facades
Reason
Glazing Specification Change
Amount
+124,000.00 €
Tracked to date
6 · 420,000 €
✓ Within the budget line
→ Pending approval
Bids vs. Budget Line
€14.6 million budget
Bid 1
Bid 3
Bid 5
Facade Package Award
Awarded €14.3 million
BidderBidvs. budgetStatus
Alder Facades€14.1M−3.4%Non-compliant
Meridian Facades€14.3M−2.1%Awarded
Kestrel Envelope€14.8M+1.4%Shortlist
Norland Glass€15.9M+8.9%Declined
Awarded €14.3 million against a budget line of €14.6 million. Illustrative screen with fictional demo data.
Projects
4
Total budget
€412M
Early warnings
2
Funding cover
96%
Bank-wide lender monitoring
Bank-wide Credit Monitoring
Early warning
New
EW-2026-007
Riverside Campus · MEP Package
Forecast drift
+7.1%
Owner
Project Lead
Decision due
November 2026
✓ Flagged automatically
→ Assigned to an owner
Budget by Project
Budget · Forecast
Northwind
Harbor
Elm St
Riverside
Portfolio
2 early warnings
ProjectBudgetVarianceStatus
Northwind Yards€104.5M+1.2%On budget
Harbor Point€138M+3.8%Review
Elm Street Lofts€61M−0.4%On budget
Riverside Campus€108M+7.1%Early warning
Two early warnings were issued, each with a designated owner and a decision date. Sample screen with fictional demo data.
Control
Manage
Calculate
The client
Münchner Hyp

Münchener Hypothekenbank is a cooperative mortgage bank based in Munich, founded in 1896, that finances residential and commercial real estate through the cooperative banking network in Germany.

View client

Check fund allocation based on a live position instead of a PDF?

Want the same level of control on your next project?